No title
When planning for constructions and buildings that can increase the risk levels, it is required by Swedish law to conduct risk assessments. These risk assessments need to prove that the planned construction or building does not increase the risk levels above an unacceptable limit. The acceptance criteria for individual and societal risk, are not strict by law in Sweden. Instead analysts are requir
